Completed Projects
ŞİRVAN–SALYAN–NEFTÇALA STEEL PIPELINE PROJECT AZERBAIJAN / AZERSU
tamam-21
| Construction Time | : | 6 months (July 2013 – December 2013) |
| Description of the Project | : | The work is renewal of drinking water pipeline which has 5936m length in total between Salyan and Neftçala town. In the scope of this project, in total;With ; Ø1000mm 5851m, 85m Ø1200m, Steel pipe fitting material supply has been completed. With reinforced concrete works project was delivered in December 2013. |
| Main Contractor | : | Texno-Atinak |