SUMQAYIT SANITATION COLLECTOR/PUMP STATION CONSTRUCTION SUMQAYIT/AZERBAIJAN / AZERSU

tamam-10

Construction Time : 36 months (2011-2014)
Description of the Project : The work is; to collect sewage and drainage water which is drained off to sea from 30 points in Sumqayıt city by collecting it with sanitation line that will be constructed and removing the water from city center coast and bringing it to pump station which will be built.

In the scope of this project, in total ;
– 237000m3 excavation,
– Ø1600mm 7069m,
– 3064m Ø1000mm,
– 348m Ø600mm,
– Ø500mm 1045m,
– 1.045m Ø710mm,
– 588m Ø560mm corrugated pipe installation is made.

Within Project 1, 4040m Ø1000mm GRP pipe ,
– 666m Ø1200mm GRP pipe,
– Pumping stations concrete and mechanical works (TM 1),
– (AAT TM) Pump station piling and jet grouting works,
– (AAT TM) pump station ,electrical and mechanical works has been completed.

By making the preparation of the project and making the preparations of expropriation plans,the entire sewage water which free-flows to sea from Sumqayıt city coast has been brought to AAT TM pump station and from here it is pumped to available treatment plant.

Main Contractor : Texno –Atinak Partnership