Completed Projects
OGUZ-GABALA-BAKU WATER TRANSMISSION LINE PROJECT / AZERBAIJAN
tamam-4
| Construction Time | : | 24 months (2007 – 2009) |
| Description of the Project | : | The work is construction and design of 2000mm diameter GRP water pipeline, water tanks and pressure breaker stations from the area of Oguz water wells up to Baku city
Works in the scope of this project are ; |
| Main Contractor | : | Atinak Engineering Construction Industry and Trade Inc. |