Completed Projects
KİLİS DRINKING WATER SUPPLY PROJECT (PUMP STATION AND TRANSMISSION LINE) / KİLİS
tamam-11
| Construction Time | : | 8 months (15.03.2005-11.11.2005) |
| Description of the Project | : | In this project the aim is to meet the needs of drinking, using and industrial water of Kilis city . Comprises project pumping facilities, 15364m long pipeline, warehouses and chlorination unit. Drinking, domestic and industrial water needs of Kilis province will be met from Seve Dam. Works in the scope of this project are;Transmission Line Pipe Type: PE100 and CTP • Pipe Diameter: Ø350mm – Ø600mm • Pipe Length: 15364m • Warehouse Related Structures • Storage Units and Total Capacity: 2 Number 500m3 • Pump Station • Pumping Station Number: 2 Number • Pump Type and Number: 3 variable speed (Booster type) 2 fixed speed • Pump Total Power: 860kw Works have been completed.The project was transferred to Kilis Municipality with provisional acceptance on 23.11.2005 and has been completed with the final acceptance on 30.11.2007. |
| Main Contractor | : | Atinak Engineering Construction Industry and Trade Inc. |