Completed Projects

GÖYÇAY CITY DRINKING WATER AND SEWERAGE NETWORK PROJECT (PHASE 2) GÖYÇAY/AZERBAIJAN / ASIAN DEVELOPMENT BANK/AZERSU

tamam-5

Construction Time : 36 Months (December 2011 – December 2014)
Description of the Project : – Reconstruction of drinking water city network
– Reconstruction of sewerage city network
– Reconstruction of the main collector sewerage line
– By constructing Sewage collector Shirvan transition channel, constructing the connection to decontamination facility
– The construction of drinking water subscriber connections, installation of pre-load meters
– In the scope of project , opening 5 additional artesian wells and and connecting them to network with pump station.
– Making chlorination dosage measurement stations
– The construction of new water warehouse,
– The construction of automation system and establishment of control building
In the scope of this project in total ;

– 130 Miles of sewer pipe installation (Ø150mm-Ø1000mm)
– 956000m3 excavation,
– Installation of 148km polyethylene drinking water pipe (Ø32mm-Ø500mm)
– 7.000m3 water tank construction,
– 19l/sec capacity of 5 new wells
– Establishment of 120m3/h capacity 2 original 2 spare pump station
– 570 fire hydrant installation,

Installation and supplying material to all these manufacturing.

Main Contractor : Atinak Engineering Construction Industry and Trade Inc.