GÖYÇAY CITY DRINKING WATER AND SEWERAGE NETWORK PROJECT (PHASE 2) GÖYÇAY/AZERBAIJAN / ASIAN DEVELOPMENT BANK/AZERSU
tamam-5
| Construction Time | : | 36 Months (December 2011 – December 2014) |
| Description of the Project | : | – Reconstruction of drinking water city network – Reconstruction of sewerage city network – Reconstruction of the main collector sewerage line – By constructing Sewage collector Shirvan transition channel, constructing the connection to decontamination facility – The construction of drinking water subscriber connections, installation of pre-load meters – In the scope of project , opening 5 additional artesian wells and and connecting them to network with pump station. – Making chlorination dosage measurement stations – The construction of new water warehouse, – The construction of automation system and establishment of control buildingIn the scope of this project in total ; – 130 Miles of sewer pipe installation (Ø150mm-Ø1000mm) Installation and supplying material to all these manufacturing. |
| Main Contractor | : | Atinak Engineering Construction Industry and Trade Inc. |