KESON WELL AND PUMPING STATION CONSTRUCTION AND VARIOUS INFRASTRUCTURE WORKS CONSTRUCTION / YALOVA/BURSA
tamam-26
| Construction Time | : | 6 Months ( 2007) |
| Description of the Project | : | The work is ; with the aim of increasing the production capacity of Aksa Acrylic Chemical Inc., ensuring the supply of cooling water from the sea and making water intake filter construction.
In the scope of project; in the sea and on land ; These works have been completed and the system is activated. |
| Main Contractor | : | Atinak Engineering Construction Industry Trade Inc. |