Ongoing Projects

Körfez Drinking Water, Sewerage and Stormwater Line Construction

korfez

The work includes DF Pipe 258.569 m Drinking Water Line, 143.120 m Sewer Line, 31.219 m Rainwater Line, 3 Drinking Water Depot, 2 Drinking Water Transfer Station Construction and house connections. The work duration is 900 days.