MADAGASCAR AMBOTOYY SEA DISCHARGE PIPE LINE MADAGASCAR / SNC-LAVALİN INC/2009

tamam-1

Construction Time : 13 Months (November 2009 – December 2010)
Description of the Project : – Detecting of detailed bathymetric map along pipeline and completion of project’s final design works.
– Preparement of diffuser pipes,
– Making the installation, setting up and testing of submarine pipeline,
– Making the installation and manufacturing of the concrete weight surrounding the pipes,
– Doing the sheetpile application
– Immersing the pipe and doing the rock fill on the seabed
Main Contractor : Atinak Engineering Construction Industry and Trade Inc.