Completed Projects

GEMLIK DRINKING WATER CONSTRUCTION, 3 GROUP ELEVATION CENTER BUILDING, 500 M3 TANK CONSTRUCTION GEMLİK/BURSA / GEMLİK MUNICIPALITY

gemlik

Construction Time : 6 months (2002)
Description of the Project : In this project;

• 2150-DM2-DM3, Ø400mm steel pumping line,
• Discharge rooms on pumping lines,
• 3 group pumping station building,
• 500m3 concrete water tank construction,
• 3 x 50L / sec capacity of the pump station installation,

Works have been completed and the system is disarmed.

Main Contractor : Atinak Engineering Construction Industry and Trade Inc.