Completed Projects

KIZILTEPE/MARDİN DRINKING WATER-TRANSMISSION LINE PROJECT MARDİN/KIZILTEPE / STATE HYDRAULIC WORKS GENERAL DIRECTORATE

tamam-8

Construction Time : 36 months (2006 -2009)
Description of the Project : The work is; providing the inadequate drinking, using and industrial water needs of Mardin city center, Kiziltepe district and Ortakoy District from Beyazsu source until 2040.
In the scope of this project ;
– 40700m Ø1200- Ø1100mm diameter GRP pipes,
– 8355m Ø800mm – Ø600mm and steel pipes with Ø500mm,
– 65000 m polyethylene pipes,
– Art structures,
– 4 pumping stations,
– in total 26500m3 6 underground water storages,
– Chlorination plant construction,
– Service and connection paths,
– Mechanical, electrical and cathodic protection works,
– Preparation of project and preparation of the expropriation plans,

These works were completed and Kiziltepe thirst destiny has been changed.

Main Contractor : Atinak Engineering Construction Industry and Trade Inc.