Completed Projects
KIZILTEPE/MARDİN DRINKING WATER-TRANSMISSION LINE PROJECT MARDİN/KIZILTEPE / STATE HYDRAULIC WORKS GENERAL DIRECTORATE
tamam-8
| Construction Time | : | 36 months (2006 -2009) |
| Description of the Project | : | The work is; providing the inadequate drinking, using and industrial water needs of Mardin city center, Kiziltepe district and Ortakoy District from Beyazsu source until 2040. In the scope of this project ;– 40700m Ø1200- Ø1100mm diameter GRP pipes, – 8355m Ø800mm – Ø600mm and steel pipes with Ø500mm, – 65000 m polyethylene pipes, – Art structures, – 4 pumping stations, – in total 26500m3 6 underground water storages, – Chlorination plant construction, – Service and connection paths, – Mechanical, electrical and cathodic protection works, – Preparation of project and preparation of the expropriation plans, These works were completed and Kiziltepe thirst destiny has been changed. |
| Main Contractor | : | Atinak Engineering Construction Industry and Trade Inc. |